Search the BARC Repository
To view specific Superfund documents, narrow your selection using the options in the right columnbelow. Where applicable, hold the "CTRL" key to select multiple items.
Displaying 351 - 375 of 811
| ID | Title | Date Sort ascending | Farm | Site | Download |
|---|---|---|---|---|---|
| G-15-0124 | USDA-ARS Meeting Minutes on CERCLA Issues - 2003 | 12/2003 | All | BARC-WIDE | |
| F-17-0334 | Soil Erosion and Sediment Control Plan: Time-Critical Soil Removal Action (BARC 32,… | 12/2003 | CENTRAL | BARC 32 | |
| F-17-0329 | Low-Level Radiation Burial Site Groundwater Summary Report February 1996 Through June 2003 | 11/2003 | NORTH | BARC 18 | |
| F-17-0327 | BARC 32 (PCB Storage Area) Draft Action Memorandum: Time Critical Removal Action (Soil… | 07/2003 | CENTRAL | BARC 32 | |
| F-17-0314 | ENTECH 20 Disposition, Human Health Risk Screening Evaluation | 07/2003 | EAST | ENTECH 20 | |
| F-17-0315 | EPIC 39 Disposition, Human Health Risk Screening Evaluation | 07/2003 | CENTRAL | EPIC 39 | |
| F-17-0316 | BARC 34 Disposition, Human Health Risk Screening Evaluation | 07/2003 | EAST | BARC 34 | |
| F-17-0317 | BARC 34A Disposition, Human Health Risk Screening Evaluation | 07/2003 | NORTH | BARC 34A | |
| F-17-0320 | College Park Landfill Vegetative Cap Pilot Study Supplemental Health and Safety Plan | 06/2003 | CENTRAL | BARC 22 | |
| F-17-0323 | BARC Site Management Plan - 2003 | 06/2003 | All | BARC-WIDE | |
| F-23-0402 | Site Screening Process - BARC 41 (B-312 Underground Storage Tank) | 05/2003 | CENTRAL | BARC 41 | |
| F-17-0312 | Site Screening Process: EPIC 11 (Open Storage) Follow-on Sampling Report | 05/2003 | NORTH | EPIC 11 | |
| F-17-0311 | Site Screening Process: BARC 41 (B-312 Underground Storage Tank) Follow-on Sampling Report | 05/2003 | CENTRAL | BARC 41 | |
| F-23-0403 | Site Screening Process - Entech RI (Structural Ruin) | 04/2003 | CENTRAL | ENTECH R1 | |
| F-20-0341 | Chronic Toxicity Tests of Surface Water Samples from ENTECH Inc, Conducted from April 18… | 04/2003 | All | BARC-WIDE | |
| F-17-0310 | Site Screening Process: ENTECH R23 (Previous D&M Investigation Site) Follow-on… | 03/2003 | CENTRAL | ENTECH R23 | |
| F-17-0299 | Remedial Investigation/Feasibility Study Work Plan for the Beaver Dam Road Landfill | 03/2003 | CENTRAL | BARC 27 | |
| F-17-0298 | Low-Level Radiation Burial Site Groundwater Summary Report February 1996 Through October… | 03/2003 | NORTH | BARC 18 | |
| F-17-0321 | Vegetative Cap Pilot Study for the College Park Landfill, Conceptual Design (Revision 0) | 02/2003 | CENTRAL | BARC 22 | |
| F-17-0322 | B-442 Scrap Area (BARC 31) and PCB Storage Area (BARC 32) After-Action Report: Debris… | 02/2003 | CENTRAL | BARC 31, BARC 32 | |
| F-20-0342 | Results of the Chronic Toxicity Tests with Eisenia Foetida and Lactuca Sativa Samples… | 02/2003 | All | BARC-WIDE | |
| F-20-0343 | Toxicity Assessment of Sediment Samples Received from ENTECH, Inc., Conducted with the… | 02/2003 | All | BARC-WIDE | |
| F-20-0344 | Results of Bioaccumulation Bioassay Tests for Samples Collected at BARC - 2003 | 02/2003 | All | BARC-WIDE | |
| F-17-0331 | Data Validation Report for BARC 31 & 32 Soil Sampling - 2003 | 02/2003 | CENTRAL | BARC 32, BARC 31 | |
| F-17-0313 | Off-Site Investigation Report for the Beltsville Industrial Center (BARC 6) - 2003 | 01/2003 | LINKAGE | BARC 6 |